constructionSCABLE also provides Construction & Installation Services in these areas :

  • Design, Supply, Delivery, Erection & Commissioning of Transmission Lines
  • Civil Works for substation & power plant projects
  • General infrastructure & construction works

Trenergy Infrastructure Sdn Bhd is SCABLE’s main construction arm based in Peninsular Malaysia. However, in maximizing our coverage in transmission business in Malaysia and optimizing our overall manpower and resources under the Group, Sarwaja Timur Sdn Bhd and Sarawak Cable Berhad are also qualified contractors targeting mainly Sarawak-based projects.

PROJECT HIGHLIGHTS CLIENT VALUE (RM)
1 132kV Single Circuit Loop to PMU 132/33kV Enstek from KLIA – Salak Tinggi Tenaga Nasional Berhad 13.0 mil
2 2 x 300MW Balingian Coal-fired Power Plant Project Shanghai Electric Co. Ltd. 493.0 mil
3 500kV Sarawak Backbone Transmission Line Project Sarawak Energy Berhad 618.6 mil
4 Pengerang 275kV O/H TL from Pengerang to Peninsular Grid and 275kV/132kV
Pengerang Substation
Petroliam Nasional Berhad 257.0 mil
5 275KV AIS Tanjung Langsat Industrial Estate Switching Station Tenaga Nasional Berhad 26.9 mil
6 Samalaju 1 – Samalaju 2 275kV transmission line project Sarawak Energy Berhad 19.1 mil

 

CIRCULAR TO SHAREHOLDERS

The Circular Report of AGM 2014 To: The Shareholders of Sarawak Cable Berhad  

Company says sales of high-voltage cables will lift bottomline

The Star Online – Tuesday, 8 September 2015 By : JACK WONG

UP
copyright © 2015 Sarawak Cable Berhad website by Madtech Online Marketing